• rechamp@hotmail.com PROFESSIONAL SUMMARY Production
Control Manager/ Sr. Maintenance Planner with expertise in training field
personnel , system impact analysis, query based reporting, Outage, resource
and preventative maintenance planning, purchasing, planning, scheduling,
Material Requirements Planning (MRP), vendor managed inventory (VMI), and
customer relations. Excellent communication, problem solving and
organizational skills. Areas of
Expertise:
Software:
Maximo 4, 6, & 7.1, Akwire (scheduler),
Primavera 6, Comet, SAP, Atlas, Access, Excel, Project, Windows, MS Office
Suite, SQL and many other applications. PROFESSIONAL
EXPERIENCE BP North America 2012 - Present Offshore/Site Planner • Plan and create complete work packs for all integrity
management (IM), tank replacements, various offshore equipment projects. • Identify parts, material, tools, skills, permitting and
personnel requirements for each step in the process using current work
management principles. • Hazard Identification Task Risk Assessment (HITRA) • Visit select job sites to estimate manpower
requirements, identify special equipment and tools required, estimate
duration of job, and identify safety hazards en-route and on-site as well as
identify environmental considerations for ad-hoc activities. • Accountable for creating detailed plans in WMS / Plan
Tools to support the delivery of the work executed by the operations and
maintenance teams on site. • Build standard job plan templates for repetitive work. Tennessee Gas Pipeline/Elpaso
Energy 2008 – 2012 Sr. Pipeline Maintenance
Planner · Improved
TGP reliability tracking and facility efficiency through participation on the
Maximo7, Akwire, and PREP implementation resulting in correct staffing levels
at each facility. · Created
documentation and trained field personnel on the new Maximo, Akwire, and Prep
procedures to reduce field personnel administrative time. · Utilized
database to analyze system impact of projects, critical events, and changes
in the pipeline operation, outage scheduling. · Coordinated,
scheduled, and monitored major plant, compressor, and pipeline maintenance
activities for the eastern half of the United States. · Coordinated
company preventive maintenance standards and system outages requirements
communicating with Gas Control and Transportation Planning departments
pertaining to equipment and system availability. Calsonic Kansei North America
2006 – 2008 Production Control
Manager · Decreased
man hours and increased production capability by reducing number of late
deliveries from suppliers by 75 %. · Implemented
control procedures for material flow and to correct inventory loss issues
resulting in a significant improvement in production times and delivery to
the customer. · Provided
oversight to a staff of twenty eight at Calsonic operations for two Nissan
plants in Tennessee and Mississippi for logistics, manufacturing,
warehousing, directed the activities of the Production Control Department
(Receiving, Production Planning & Customer Service, Material Handling,
and Inventory control). Tepro Inc. 2004 – 2006
Production Control Manager Automotive supplier of rubber
extrusion and weatherseal. · Implemented
control procedure for inventory and flow of material involved in the
extrusion and injection molding of rubber and the production of automotive
weather seal for a facility with 875 employees. · Established
an Industrial Engineering Department to design and maintain the plant layout,
material flow, process flow, and packaging requirements for these facilities. · Managed
a staff of 50+ employees in seven departments at three facilities for logistics,
manufacturing, warehousing, receiving, shipping, production planning,
customer service, material handling, and inventory control, pass through part
preparation, and Industrial Engineering Flextronics International 2000
– 2003 Contract manufacturer of
electronics · Developed
production schedule to ensure shipping accuracy over 95%. · Established/changed
production schedule to maximize productivity and assure finished goods
availability. · Analyzed
and reported on customer forecast accuracy; and recommended changes. · Established
procedure for high value (HV) and multiple account inventory control. · Collaborated
on SAP to BAAN Implementation team, ISO9000 Audit Team, and Supplier
certification task force. ADDITIONAL
RELEVANT EXPERIENCE Purchasing
Agent, DOD Naval Supply Center, Bremerton, WA. EDUCATION
AND CERTIFICATIONS West
High School, Bremerton, WA, Diploma Olympic
College, Bremerton, WA, undergraduate studies Department
of Defense Small Purchase School, Certificate, 1987 Planning
and Scheduling Asset Maintenance with Maximo, Certificate, 2010 |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|